For its fourth launch of the year, Arianespace will orbit four more satellites (satellites 23 to 26) for the Galileo constellation. This mission is being performed on behalf of the European Commission under a contract with the European Space Agency (ESA).
For the third time, an Ariane 5 ES version will be used to orbit satellites in Europe’s own satellite navigation system; with all Galileo spacecraft having been launched to date by Arianespace. Ariane 6 will take over from 2020.
The Flight VA244 will be from Ariane Launch Complex No. 3 (ELA 3) in Kourou, French Guiana.
The Launch Readiness Review (LRR) will take place today, July 20, 2018 in Kourou, to authorize the start of operations for the final countdown.
After the VA244 launch, the GSA will be responsible for operating the satellites as soon as they are separated from the launcher. These operations of setting up and operating the system will be done in collaboration with ESA.
The Galileo satellites are built by prime contractor OHB System in Bremen, Germany, with the payloads supplied by UK-based Surrey Satellite Technology Ltd (SSTL), which is an Airbus Defense and Space affiliate.
For further information, download the Flight VA244 Launch Kit.