Tag Archives: Arianespace

Soyuz Flight VS15

Soyuz VS15 - Fregat transferFregat fueled
Arianespace’s new Spaceport processing facility has fueled another Fregat stage. This upper stage for the medium-lift Soyuz launcher will be used for the May 24 flight from French Guiana with two European Galileo navigation satellites.

Named the FCube (Fregat Fueling Facility), the purpose-built installation is utilized to “top off” Fregat upper stages during Soyuz launch campaigns at the Spaceport. In service since last year, the FCube supports Arianespace’s sustained launch pace, giving the company greater flexibility in managing its mission manifest, while also increasing launch capacity with Soyuz and its other launch vehicle family members: the heavy-lift Ariane 5 and lightweight Vega. Read more…

[VID] VS15 Launch campaign

Next a set of five videos describing the Arianespace Soyuz Flight VS15 is presented. Liftoff is scheduled for Tuesday, May 24, 2016 at 05:48:43 a.m. local time (French Guiana) / 04:48:43 a.m., Washington, D.C. / 08:48:43 a.m., UTC / 10:48:43 a.m., Central European Time / 11:48:43 p.m., Moscow

Jean-Pierre Barlet, Arianespace Launch Site Operations Manager

 

Jean-Cristophe Delaunay, Arianespace deputy Mission Director

 

Paul Verhoef, ESA Director of the Galileo Programme and Navigation related Activites

 

Thierry Fahem, Galileo FOC-M5, Sat 13-14, Arianespace Programme Director

 

Arianespace mission personnel provides details on Soyuz’ nearly 4-hour flight sequence

 

Launch 7. Payload integration begins

sat-13 integrated on its payload dispenser. Soyuz VS15The first of two Galileo navigation satellites to be orbited on Arianespace’s May 24 Soyuz flight has been integrated on its payload dispenser system, marking a key step as preparations advance for this medium-lift mission from French Guiana.

Named “Danielė”, the spacecraft was installed last week during activity inside the Spaceport’s S3B payload preparation facility. It is to be joined on the dispenser system by the mission’s other passenger, “Alizée”, whose own installation is forthcoming in a side-by-side arrangement.

The pair are then to be mated atop Soyuz’ Fregat upper stage and encapsulated in the protective payload fairing. Prime contractor OHB System in Bremen, Germany produced the satellites, and their onboard payloads are supplied by UK-based Surrey Satellite Technology Limited (SSTL), which is 99-percent owned by Airbus Defence and Space. Read more…

Galileo 13 & 14 fueled

Galileo satellite 13 and 14 fueledPreparations for Arianespace’s upcoming mission have moved into the fueling phase for the two Galileo navigation satellites that will be orbited by a medium-lift Soyuz on 24 May from the Spaceport in French Guiana.

Technicians donned spacesuit-like protective outfits to handle the toxic hydrazine fuel that will enable the two satellites to fine-tune their orbits and orientation over the course of their working lives of 12 years or more.

The 13th Galileo satellite was fuelled on 3 May, with the 14th being fuelled a day later.

After fuelling both satellites have been connected to “checkout terminal equipment” to enable battery charging and atomic clock monitoring. Read more…

Two Galileos are “fit” for their Arianespace Soyuz launch in May

Soyuz_VS15_fit_checkThe next two spacecraft to join Europe’s Galileo global satellite navigation system have made their initial contact with launcher hardware at the Spaceport in French Guiana, continuing the preparations for their liftoff on an Arianespace Soyuz vehicle in May.

During activity in the Spaceport’s S1A clean room facility, both spacecraft completed the initial “fit check” process, in which they were installed on the dispenser system that will deploy them in orbit during the May 24 flight.

The two FOC (Full Operational Capability) Galileo satellites were then removed, enabling their continued preparation and fueling. Prime contractor OHB System in Bremen, Germany produces the Galileo FOC spacecraft. Read more…

Soyuz VS13 mission

Galileo 11 and 12 on dispenser

This is a summary of the main milestones achieved in Kourou in the last days, before declaring the green light in the Launch Readiness Review.

December 10
Installation of Galileo 11 and 12 and their dispenser system atop Soyuz Fregat occurred in the European Spaceport’s S3B clean room facility. The dispenser will deploy the satellites by firing a pyrotechnic system for separation in opposite directions at the orbital insertion point.

Fregat operates as Soyuz’ fourth stage, providing an autonomous and flexible propulsion system. Built by Russia’s NPO Lavochkin, it will perform two propulsion burns during the Galileo mission with the upper stage designed to be restarted up to 20 times in flight.

December 14
Rollout and vertical positioning of the Soyuz three-stage vehicle. Soyuz was moved via a transport/erector rail car in a horizontal-transfer process from the MIK launcher assembly facility to the Soyuz ELS launch complex. Once on the launch pad, Soyuz was erected to the vertical orientation, where it was suspended in place by four large support arms, followed by the transport/erector rail car’s withdrawal. Read more…

[VID] VS13 Launch campaign

The two Galileo spacecraft for Arianespace’s latest Soyuz launch at the service of Europe’s Galileo satellite-based navigation system, and the company’s record 12th mission overall in 2015, have been integrated at the Spaceport in preparation for their December 17 liftoff from French Guiana.

Giuliano Gatti, ESA’s Galileo Space Segment Manager.

 

Thierry Fahem, Arianespace Galileo sat 11-12 project director.

 

Thierry Wilmart, Arianespace Galileo sat 11-12 mission director

 

Jean-Claude Garreau, Arianespace Launch Site Operations Manager